We plan and execute migrations to AWS and Azure. Mapped dependencies, phased cutovers, zero surprise downtime.

Talk to us about cloud migration

Cloud Migration services we provide

Migration assessment & planning

Infrastructure assessment, dependency mapping, and a target architecture decision, before any workload moves.

Migration execution

Phased execution across compute, storage, and managed services, sequenced by risk, not convenience.

Application modernization

Re-architecting into containers, serverless, or managed databases where it's worth it, not modernization for its own sake.

Infrastructure as code

Infrastructure provisioned as Terraform, version-controlled and repeatable, not manual configuration that drifts.

Security & compliance

Secure data transfer, IAM setup, and network security built into the migration, mapped to whatever framework you're working toward.

Post-migration optimization

Performance tuning, cost cleanup, and monitoring set up once workloads are stable, not left for later.

Benefits of cloud migration

Lower total cost of ownership

Pay for the capacity you use instead of provisioning for peak load year-round, with reserved and spot capacity filling in behind autoscaling.

Elastic scalability

Scale within minutes instead of a procurement cycle measured in weeks. Traffic spikes don't require guessing capacity months ahead.

A stronger security baseline

IAM, encryption, and network segmentation built into the target architecture from day one, not retrofitted after launch.

Faster time-to-market

Managed services and CI/CD pipelines replace infrastructure your team used to build and patch by hand, freeing engineering time for product work.

Built-in resilience

Multi-AZ architecture and tested rollback paths mean redundancy is part of the design, not a disaster-recovery plan nobody's tested.

Access to managed & AI/ML services

Once the migration lands, managed databases, queues, and AI/ML services are available without standing up and operating them yourselves.

Challenges we solve

Challenge 01

Unmapped dependencies

Undocumented service dependencies turn a planned cutover into an incident.

Our solution

Full dependency mapping before any workload moves, so nothing breaks blind.

Challenge 02

All-or-nothing cutovers

A single big-bang migration window means one mistake takes everything down.

Our solution

Workloads move in phased waves, each with a tested rollback path.

Challenge 03

Cost surprises post-migration

Lift-and-shift migrations often land 30-50% over the original cost estimate.

Our solution

Target architecture right-sized for cloud-native pricing, not a copy of on-prem.

The 6 R's of cloud migration

Not every workload should move the same way. Which of these applies is decided per workload, not applied blanket-wide.

Rehost (lift & shift)

Move as-is. Fastest path and least architectural change, usually a starting point rather than an end state.

Replatform (lift & optimize)

Move with targeted upgrades, a managed database instead of a self-hosted one, for example, without a full rewrite.

Refactor (re-architect)

Redesign for cloud-native patterns when the current architecture won't scale or costs too much to keep maintaining.

Repurchase (replace)

Swap a self-hosted or legacy system for a SaaS equivalent when maintaining it yourself no longer makes sense.

Retain

Some workloads shouldn't move yet, compliance constraints, imminent retirement, or unclear ROI. Retaining is a decision, not a failure to migrate.

Retire

Decommission what nobody's using. Every migration surfaces workloads that turn out to be dead weight.

Ready to start your cloud migration?

We'll assess what you're running before proposing anything, not the other way around.

Talk to an Expert

The migration journey

01

Assessment & planning

Map dependencies and decide the target architecture before anything moves.

02

Strategy & sequencing

Decide which of the 6 R's applies to each workload, and in what order.

03

Phased execution

Workloads move in waves, each with a tested rollback path.

04

Validation

Confirmed under real traffic before the next wave starts.

05

Optimization & handoff

Right-sizing, cost cleanup, and documentation handed over.

What you can count on

Not client-average numbers, commitments built into how every migration is run.

8–16 wks

Typical phased migration timeline

Zero

Surprise downtime, by design

100%

Of waves ship with a tested rollback path

Right-sized

Target architecture, not a lift-and-shift copy

FAQ

Frequently asked questions

How long does a cloud migration take?+

8–16 weeks for most mid-sized environments, in phased waves.

Do you handle cloud-to-cloud migrations, not just on-prem to cloud?+

Yes, on-prem to cloud and cloud-to-cloud across AWS and Azure.

Will migrating cause downtime?+

Not by design. Workloads move in phased waves with tested rollback paths, so a failed wave doesn't take production down.

Do we need to decide the migration strategy ourselves first?+

No. Assessment comes first. Which of the 6 R's applies to each workload is decided during that phase, not before it.